Controls are not an add-on discipline.
They are the layer that determines whether building systems operate coherently after handover. servomatrix engineers that layer with the discipline a serious building deserves.
A specialist, not a generalist.
servomatrix works only on building controls. That focus is the point: the discipline carries operational risk that a general contractor is not set up to own.
- Based in
- Beirut, Lebanon
- Serving
- Middle East & Africa
- Focus
- BMS and building controls integration
- Engagement range
- Design support through commissioning and lifecycle support
- Integration approach
- Protocol-led and documentation-driven
Technical background.
A leadership and technical-background section will be published here once verified biography, qualifications and professional details are provided. This space is intentionally left as a structured placeholder rather than populated with unverified claims.
- Name
- Title
- Professional background
- Qualifications / certifications
- Markets served
- LinkedIn profile
How servomatrix works with project teams.
Consultants
We resolve the controls package against your design intent — architecture, points, sequences and integration boundaries — so the specification is buildable and the system is commissionable.
Developers and owners
We protect the operational asset: a documented, maintainable control system that performs after handover and can be supported through its life.
Main and MEP contractors
We deliver a defined controls scope with clear interfaces and disciplined documentation, and support installation and commissioning on site.
Facility operators
We hand over a system you can run — operator graphics built around your workflow, trained staff, and a support model for what comes after.
How the work is actually done.
Clarity over cleverness
Logic and documentation are written to be read and maintained by the next engineer, not to impress.
Integration-first
Interfaces and responsibilities are defined early, so systems work together rather than being forced together on site.
Commissioning discipline
Sequences are proven against intent and recorded, so the building is accepted on evidence, not assumption.
Support after handover
The relationship continues under a defined scope, so performance is maintained rather than left to drift.
Planning a BMS package, controls upgrade or commissioning scope?
Send the available drawings, specifications, points schedule or project brief. We will review the control requirements and identify the most practical next step.